Browse Data
1994 - Pram Point/Vanda Station
- Mission:
- Soil contamination studies Vanda Station from a series of sites spaced 1m apart; to determine if contaminants are being redistributed through the soils as a result of capillary movement and evaporation of moisture
- Scientists:
- IBC, GGC (DIC, DSS, MRB)
- Number of sites:
- 82
- Sites ids:
- 720 to 781